Friday, September 7, 2007
Construction Update # 2
The previously walled up door is gone, as are all the walls, and the framing on for the ceiling is nearly done. Electrician was out of town this week so we have to wait until Monday so he can rewire the room and move the ceiling wires for a ceiling fan into the center of the room, then it's time for sheetrock and drywall. Tile guys are schedule for the 19th, so hopefully we'll be all wrapped up with everything by the 22nd. :)
Subscribe to:
Post Comments (Atom)
3 comments:
Wow. Down to the bare bones!
Only a couple of weeks? Wow. Our shower in the old house was out of commission for almost a year while I dinked around with it. The fastest part of the refurbishing came when an actual contractor came out and installed the glass door and panel. 14 months and bang-o, small construction job complete! :)